1. Without the need for scaffolding
2. All action on site can be followed on video in the inspection cabin.
3. The steel wall is being inspected by means of video and US measurement.
4. Blasting of spots off the steel wall by means of specialized dust free blasting equipment.
5. Fixing the rockwool and cladding back into place, piece by piece.
6. Cold and hot towers and pipelines can be inspected on line.
7. Substantial savings due to:
Call us: +31(0)40 235 22 00
or go to our contact page