At the end of 2009 the specialist crew of
FG International Holland B.V., well known
for their expertise on replacing flare tips
without the deployment of cranes or helicop-
ters, replaced flare tips at a plant of Total
Indonesia ...
Click here to download and read this news article.
For more information please contact us
The lift off of the old flare tip from a GDF platform in the North Sea by the FG LAF system. The tip is pulled back inside onto deck of the rig.
The old tip is launched from the rig deck and lifted into position for installation. All finished well and within the predicted time frame, very much to the satisfaction of the client.
For more information please contact us
Re-installation of ABN AMRO signs at the company headquarter in Amsterdam.
Special Lifting services of FG International Holland BV. Lifting 2 signs of each 35m2 at 100 meter and fixing at the vertical outer wall by FG LAF system. Fully certified lifting system, for hoists of any height, up to 10 tons.
Call us:
+31(0)40 235 22 00
or go to our
contact page