FG ACE – FG Access Construction Engineering
The more than 25 years of experience in Access Construction Engineering has not come just by itself.The way FG International Holland BV is thinking about how to provide access to difficult accessible locations is embedded in FG’s ability to look beyond the problem.
Bring it to a larger environment and look what combinations of existing techniques and equipment could do the job. Then provide solid evidence that the FG proposal is feasible, although we know that at first customers do not believe that what we propose will do the job, they simply do not look at the problem as FG does.
The engineering figures and detailed drawings and graphics will definitely show it can be done the FG way.
Next to that the FG way of providing access is often saving time and money, however you have to give it a chance to prove it, and that is not easy if you keep looking at traditional methods. That is why we will challenge anyone with an access problem: “Three times left is right as well” and you will see FG can solve it all.
- Services
- FG LAF - FG Lifting Arch Frame Flare Tip Exchange
- FG FSM - FG Flare Stack Maintenance
- FG FHS - FG Flare Tip Handling System
- FG CLT - FG Container Lightering Tool
- FG SPL - FG Single Pole Lifting
- FG SLS - FG Special Lifting Solutions
- FG TIC - FG Tank Inspection Construction
- FG SIC - FG Sphere Inspection Construction
- FG RIC - FG Reactor Inspection Construction
- FG RRP - FG Retractable Flare Refurbishment Program
- FG RMP - FG Retractable Flare Maintenance Program
- FG HPS - FG Hydroshield Protection System
- FG JAC - FG Jetty Access Construction
- FG LLC - FG Loading Arm Lifting Construction
- FG RULES - FG Rig Uplifting Leg Extension System
- FG HRL - FG High Rise Building Lifting
- FG HBT - FG Home Based Testing
- FG ACE - FG Access Construction Engineering
- FG DLC - FG Derrick Lifting Construction
- FG RAS - FG Rope Access Services
- FG ENG - FG Engineering Services